Friday, September 24, 2010

Thursday, September 23, 2010

BBQ Hood is in



Posted by Picasa

Saturday, September 18, 2010

Cabinets are going in!


The cabinet bases are in, interior painting has started. The granite counter tops are being finished. TheBBQ hood venting is all fabricated and ready to be installed.

Posted by Picasa

Saturday, September 11, 2010

Flooring is being installed

The drywall is finished and the ceramic tile flooring is being installed. The outside stucco is also done. Not much longer before it's done.




Posted by Picasa

Saturday, August 28, 2010

Dry Wall is going in

Dry wall is up and the prep for stucco is finished.

The stucco will be applied on Saturday and the final taping and dry wall finish will be done on Monday

Floors and cabinetry will be next.


Posted by Picasa

Sunday, August 22, 2010

Final Sprinkler Heads

Here are the final sprinkler heads - Once we paint the pipe a matching brown color, the sprinklers will not be very noticeable.

Insulation inspection on Monday (8/23) and drywall starts on Tuesday!!!

Posted by Picasa

Wednesday, August 18, 2010

Finally - Sprinklers Approved!

After a 6 week delay, the Fire Marshall approved the sprinkler design. They installed the sprinklers on Tuesday. The heads that are shown are only temporary, until they finish the "bucket test". Then, much smaller brass heads will be installed.



Posted by Picasa