Saturday, May 15, 2010

Final Prep Before Pouring Foundation

Foundation framing is almost done. Conduit for floor outlets and low voltage wiring is in place. Notice the large bolts to hold the Hardy Wall frames.
Concrete should be poured on Wednesday 5/19.